The average length of time to complete construction of a multifamily building, after obtaining authorization, was 19.8 months, according to the 2022 Survey of Construction (SOC) from the Census Bureau. The permit-to-completion time in 2022 was 2.3 months longer than in 2021, as supply-chain issues and the ongoing skilled labor shortage challenged the industry. The average time to build… Read More ›